ARAMCO DHAHRAN ETS#10

• Executed all the electromechanical works in the ETS room.
• The construction of a special ETS room.
• Polishing Chiller Capacity 1,500TR.
• Steel Structure.
• 2 Heat Exchangers.
• 4 Process Pumps.
• Switchgear 13.8KV & 0.4 KV.
• Panels (MCC, DDC, LCP, FACP, RLDS).
• SCADA System GE.
• Softstarter 0.4 KV.
• VFD 0.4 KV.